• Facebook
  • Twitter
  • LinkedIn
  • RSS

Lincoln Elementary School

This project, seeking a LEED Silver rating, will demolish approximate 56% of Building “B”, leaving only the historic Lincoln High School portion. The historic portion of the building will then be renovated and an addition constructed that will allow the entire school to be housed in one building with a state rated capacity of 659 student. During construction, the students and staff of the “B” building will be relocated across the street to the “A” building and portables. Following the reconstruction of the “B” building, the entire school will be located in the new building on the “B” site.